RF preparation
Anechoic-chamber setup.
Personnel are present, so the scene represents alignment and instrumentation preparation with RF transmission off. It does not claim a completed EMC campaign or result.
Technology
Sirona connects payload, command, processing and signed evidence while identifying which elements are implemented, proposed or awaiting external validation.
Architecture
Every interface has an owner, an acceptance condition and a record. The architecture is designed to preserve customer control without pretending that all flight hardware already exists.
Identity, role, decision, limits and approval policy.
Tasking, scheduling, command approval and safe-state logic.
Payload, time, calibration, attitude and platform state.
Processing, uncertainty, provenance, alert and replay.
Payload and platform
Sirona intends to retain payload requirements, system architecture, timing, calibration, tasking, evidence and mission authority. Proven buses, conventional subsystems, launch and environmental services can be procured from qualified suppliers.
Verification environments
Sirona intends to move from controlled setup and real-sky observation to representative hardware and environmental evidence. The scenes below describe future validation routes, not completed Sirona tests.
RF preparation
Personnel are present, so the scene represents alignment and instrumentation preparation with RF transmission off. It does not claim a completed EMC campaign or result.
Real-sky route
A future provider observatory could support multi-night GEO observations, reference comparison and independent replay. No telescope access or measured result is claimed.
Technology foundation
Ground evidence, secure mission operations and flight software interfaces are implemented in the workspace. They remain pre-production, unqualified and not customer accepted.
Tasking, synthetic observation, detection, tracklets, orbit estimate, uncertainty, alerts, evidence bundle and replay.
Implemented and internally testedCommand policy, cryptography, communications, audit, API, SDK, operations console and deployment assets.
Pre-production workspaceScheduling, fault handling, secure-element interfaces, attestation and reconfiguration patterns on host and emulated targets.
Not flight qualifiedMaturity
Passing local tests matters. It does not replace customer acceptance, independent validation, target hardware or flight qualification.
Begin with a private conversation
Sirona can open the current evidence boundary for a technical, regulatory or investment review under the appropriate confidentiality terms.